Question: 5. Every time a machine breaks down at the Dynaco Manufacturing Company (Problem 3), either 1, 2, or 3 hours are required to fix it,

5. Every time a machine breaks down at the Dynaco
5. Every time a machine breaks down at the Dynaco
5. Every time a machine breaks down at the Dynaco Manufacturing Company (Problem 3), either 1, 2, or 3 hours are required to fix it, according to the following probability distribution: Repair Time (hr.) Probability 0.20 1 2 0.50 3 0.30 100 Simulate the repair time for 20 weeks and then compute the average weekly repair time. 1. Daco Manufacturing Table from 3 Simulation Breakdown RN Breakdown RN Repair time breakdown Cumulative Repairs 1 2 3 Repair mo weed 0 0 O 0 PO 01 0.2 016 02 015 01 Breakdown 0 1 2 3 4 5 3 Repay Time 4 5 PO Cumulativo B 0.2 7 0.5 B 03 1 10 11 12 Simulated avg. repair time T3 14 15 Theoretically calculated 16 17 18 19 20 21 22 23 24 25 220 Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 10 17 18 19 20 Page 1 o 0 a 0 0 D 0 0 D 0 0 0 0 D Average repartime 20

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!