Question: 5 . High Lift Construction Co . has determined that the heaviest load to be lifted on a project they anticipate bidding weighs 1 3
High Lift Construction Co has determined that the heaviest load to be lifted on a project they anticipate bidding weighs lb From the proposed tower crane location on the building site, the required reach for this lift will be ft The crane will be equipped with a L jib and a twopart hoist line see the Table load chart This critical lift is of a piece of limestone facing and will require a lb spreader bar attached to a lb set of slings. If assembled in the proposed configuration, can the crane safely make the pick?