Question: 5 . ( Optimization ) A company is constructing a square - based building with a flat roof. The floor and roof of the building

5.(Optimization)
A company is constructing a square-based building with a flat roof. The floor and roof of the building cost \(\$ 50\) per square meter to construct. Three of the walls cost \(\$ 30\) per square meter, while the wall facing the direction of the highest average wind speed is reinforced and costs \(\$ 60\) per square meter. The building is required to have a volume of 1200 cubic meters. What dimensions of the building minimize the total cost of materials?
5 . ( Optimization ) A company is constructing a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!