Question: 5. Project costs that do not change with the project activity level are called a. Variable fixed costs b. Indirect costs c. Fixed variable costs

5. Project costs that do not change with the
5. Project costs that do not change with the project activity level are called a. Variable fixed costs b. Indirect costs c. Fixed variable costs d. Direct costs 6. Choose the best answer. Models and methods are: a. Tools to use throughout project management. b. Ways of understanding the situation (models), and tools to use to achieve an c. outcome (methods). d. Part of the Project Manager's toolbox. e. All of the above