Question: 5. value: 5.78 points Exercise 2-3 Computing Job Costs [LO3] Weaver Company's predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage
5.
value: 5.78 points
Exercise 2-3 Computing Job Costs [LO3]
| Weaver Company's predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-200: |
| Direct materials | $230 |
| Direct labor | $180 |
| Required: |
| 1. | What is the total manufacturing cost assigned to Job A-200? |
| Total manufacturing cost | $ | |
| 2. | If Job A-200 consists of 60 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) |
| Average cost | $ per unit
| |
![5. value: 5.78 points Exercise 2-3 Computing Job Costs [LO3] Weaver](https://s3.amazonaws.com/si.experts.images/answers/2024/09/66dff178753f2_37666dff1781c035.jpg)
578 points Exercise 2-3 Computing Job Costs [LO3] Weaver Company's predetermined overhead rate is S18.00 per direct labor-hour and its direct labor wage rate is S12.00 per hour. The following information pertains to Job A-200: $230 Direct materials Direct labor $180 Required 1.What is the total manufacturing cost assigned to Job A-200? Total manufacturing cost 2.lf Job A-200 consists of 60 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.) Average cost per unit
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts