Question: 5.8) Three mutually exclusive projects are being considered by Sesame Street Productions (SSP). The project details are provided in the table below. SSP has heard
5.8) Three mutually exclusive projects are being considered by Sesame Street Productions (SSP). The project details are provided in the table below. SSP has heard about your excellent analysis skills and wants you to help them make a decision. Use a B/C analysis. SSP uses a MARR of 8%.
Calculate the B/C Ratio for each project and enter your answers with two decimal places as 1.23. If there is a zero before the decimal, you must enter it as 0.12.

Project A Project B Project C Initial Cost $500 $450 $600 Annual Benefits $150 $150 $200 Project life (years) 2 4 4 B/C Ratio SSP may eliminate project incremental analysis. SSP must choose project without performing an based on the B/C Analysis Just enter the Project name as A, B, or C