Question: 6 6 Business Analysis for Practitioners: A Practice Guide Based on the requirements, George collaborates with the team to develop a low - fidelity model
Business Analysis for Practitioners: A Practice Guide
Based on the requirements, George collaborates with the team to develop a lowfidelity
model see Figure that traces requirements to various areas of the model.
The model reflects the stakeholder and functional requirements, resulting in key aspects of solution
design. They are careful not to identify how the requirements will be delivered technically using
springs, hinges, etc. as it is their job, as business analysis practitioners, to refrain from identifying
technical design.
The process of getting the design refined enough for approval involves multiple rounds of updates,
validation from stakeholders that the design reflects their intentions, and revisions based on
stakeholder feedback.
Table Requirements Traceability Matrix with Acceptance Criteria
Objectives Acceptance Criteria Model
Area
Requirement Status PriorityID Author
George
George
George
George
George
BO
PO
BO
PO
BO
PO
BO
PO
BO
PO
ME
ME
ME
E M
Area
Area
Area
Area
SR
FR
FR
NFR
NFR
Residents of any ability will be
able to participate together in
family meal preparation whether
standing up or sitting down.
Work surfaces along walls will
be able to be hidden behind
counters.
Workspace counters will be
heightadjustable to allow
people of different heights to
work safely.
The kitchen will accommodate
to people of different
abilities working together for
meal preparation.
Heightadjustable workspace
counters will be able to support
lbs kg
When the counter is
hidden:
There is no evidence
of the counter.
Floor space can be
used for other
activities.
The counter can be set
at any height between
ft and ft cm
Eight people can be in
the kitchen preparing
food with a minimum
of ft cm of space
on either side of each
person.
The counter can hold the
weight of lbs kg
of kitchenware for days.
Case Study: Analyze Solution Information
The requirements for the house continue to evolve as the business analysis team iteratively
elicits and analyzes the requirements. As they are refined, George recognizes that the acceptance
criteria need to be defined. He works with the team and customers to elicit them and updates the
requirements traceability matrix to include the acceptance criteria see Table Read the case study in the link, and address the following:
List the components aspects or features that are assembled for recommendation.
Explain the benefits of these elements on the assignment project
Create a sample solution matrix or a solution framework that will meet stakeholders needs other than an affinity diagram.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock