Question: 6 -a)List the documents that would be used to control costs, meet the construction timeframes and inform associated trades of the required quality standards in
6 -a)List the documents that would be used to control costs, meet the construction
timeframes and inform associated trades of the required quality standards in Australia.
Control costs (minimum 3)
Timeframes (minimum 2)
Quality standards (minimum 2)