Question: 6. For the 10 scenarios below, write down the type of waste (One word only) (20 points) 6-1. Delayed bus arrival at the station 6-2.

6. For the 10 scenarios below, write down the

6. For the 10 scenarios below, write down the

6. For the 10 scenarios below, write down the

6. For the 10 scenarios below, write down the "type of waste" (One word only) (20 points) 6-1. Delayed bus arrival at the station 6-2. Preparing a meal order with wrong details (such as adding sugar and cream in the coffee while it was asked to be black and no sugar added) 6-3. Waiting for the immigration officer to update your study permit application status 6-4. Hiring an expensive chef to work in am industrial kitchen 6-5. Switching your mouse between 3 screens (laptop and 2 desk monitors) back and forth 6-6. More staff than needed in a retail store 6-7. Misinterpreting one question on an exam, and answering it based on such assumptions 6-8. Buying an expensive smart phone for the fancy features which may never be used 6-9. Traveling to a farther store to buy a product you could buy online with free shipping 6-10. Employee turnover 9110 111 12 13 1 14 1 15 16 12 13 19 3. In the following table, specify if each of the 10statements is True or False. For the ones that are false, in the right column of the table please provide a few wordsand explain what is the correct statement (15 points) Statement If it is Falso, why do w change makes it correct? 3-1. Oil refinery is a typical example of a continuous flow True architecture 3-2. The position that the firm wants to occupy in its True competitive product space is called the strategic position 3-3. Unit Load is the maximum time that can be allocate to True each flow unit in order to keep up with the demand 3-4. All current best practices of world-class firms for a given True product/service are called Strategic Fit True 3-5. External bottleneck refers to a situation where in spite of enough capacity by a resource, they are not receiving enough demand from outside, or they are not having all the supplies needed (such as raw materials) to let them prepare or deliver the demanded product/service True 3-6. A process flow time is equal to the flow time of its critical path plus non-critical path True 3-7. If there is no waste in a process, the throughput of a resource will be the same is its effective capacity True 3-8. Product mix modification refers to choosing the right True product to manufacture monaste in a process is the wait time uracture 3-9. The only waste in a process is the wait time True True 3-10. Minimum Activity time with zero wait time is called the theoretical flow time

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!