Question: 6 Maintaining a control chart is like a short term investment. When a process is in control, it is not predictable. Our ability to predict
6 Maintaining a control chart is like a short term investment. When a process is in control, it is not predictable. Our ability to predict behavior allows us to be safely ahead of potential issues, resolving them before they become unmanageable. True False 1 point 7. Question 7 UCL and LCL and _________ limits Customer Supplier Specification Tolerance 1 point 8. Question 8 Anti-biasing factors are based on ________ Sub group size and the type of control chart The type of control chart and the variance The variance and the sub group size The tolerance and type of control chart 1 point 9. Question 9 Normality is important for moving average charts False True 1 point 10. Question 10 A(n) ________tracks the number of defectives. n chart c chart p chart np chart 1 point 11. Question 11 C charts and u charts are based on the Normal distribution Poisson distribution Binomial distribution Geometric distribution 1 point 12. Question 12 In EWMA, instead of weighing each point equally, the weights decrease exponentially going back in time. False True 1 point 13. Question 13 A special cause can the result from any one point outside the plus or minus 3 stdev interval from the center line any one point outside the plus or minus 2 stdev interval from the center line any one point outside the plus or minus 1 stdev interval from the center line None of the above 1 point 14. Question 14
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
