6. Time estimates for the network shown in question 5 are provided in the table below. Please Complete the shaded cells on the table. What is the probability of completing the path B-C-F-G in 141 days? Task Optimistic Most likely Pessimistic Expected Time Variance Estimate Estimate Estimate (ET) A 11 15 19 15 1.777778 B 10 18 38 20 21.77778 C 60 75 90 75 25 D 12 21 24 ? ? E 28 30 32 2 ? F 15 24 39 25 16 G 2 5 8 5 1 H 10 15 20 15 2.777778 Probability of completing the path B-C-F-G in 141 days =