Question: [ 7 0 points ] Three wells ( A , B , and C ) are installed in an aquifer. B is 1 0 k

[70 points] Three wells (A,B, and C) are installed in an aquifer. B is 10km east of point A, and C is 10km north of point A. The water level at B is 50cm below A, and the water level at C is 70cm below A. It is estimated that the hydraulic conductivity along line AB is 10md with a porosity of 0.2, and along line AC is 5md with a porosity of 0.1. Please:
(1) Calculate the hydraulic gradients along lines AB and AC,respectively.
(2) Calculate the specific discharges along lines AB and AC, respectively.
(3) Calculate the actual velocities along lines AB and AC, respectively.
(4) Assume there is a contamination at well A, calculate the how long it will take for
contamination to transport from A to B and from A to C, respectively.
[ 7 0 points ] Three wells ( A , B , and C ) are

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!