Question: 7 1 pts Given all other things equal, an internal control situation (A) with more key controls in the same transaction stream than another situation
7 1 pts Given all other things equal, an internal control situation (A) with more key controls in the same transaction stream than another situation (B), the preliminary control risk assessment for situation (A) should generally have a control risk assessment that is Key controls do not apply to preliminary control risk Equal Risk Lower Risk Higher Risk
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
