Question: 7 . 3 A project requires 4 0 , 0 0 0 cy of compacted fill that must be completed in 3 2 work -

7.3A project requires 40,000 cy of compacted fill that must be completed in 32 work- ing days. The fill material will be hauled to the site in 21-cy, loose measure, trucks. The cycle time for a truck is 40 min per trip. The swell factor for the earth is 25% and the shrinkage factor is 10%. Assume 8 hours per day and a 45-min effective hour. Determine the number of required trucks to complete the project in 32 days.