Question: 7 . 5 1 Figure P 7 . 5 1 shows a 2 0 m thick layer of normally consolidated clay ) = ( 1

7.51 Figure P7.51 shows a 20m thick layer of normally consolidated clay )=(18.6kNm3 that is one-dimensionally loaded by v=60kPa. The clay layer is below a 3m thick layer of granular fill )=(19.6kNm3, and a dense, compacted glacial till underlies the clay. The water table is located at the top of the clay layer. A 1-D consolidation test is performed on a 2.20cm thick, doubly drained specimen from the middle of the clay layer. When the stress conditions from the field (including the v=60kPa ) are applied to this specimen, it takes 4min for 90% average consolidation to occur.
Figure P7.51
Figure P7.51 Full Alternative Text ?
a. From the lab test data, determine cv for the soil.
b. Compute the pore pressure at depth 18m before and immediately after the 60kPa stress is applied.
c. Compute the total vertical stress (v) at depth 18m after the 60kPa stress is applied in the field.
d. At depth 18m, compute the effective vertical stress (*')5 years after the 60kPa is applied.
7 . 5 1 Figure P 7 . 5 1 shows a 2 0 m thick

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!