7 5 points Master Production Schedule - Capacity Requirements Using the data and information from the following chart, what is the Total Capacity Hours Required for the 1,200 Units scheduled for Month 4? (Refer to Slides 20 and 21 in Chapter 03) MONTHS 2 3 Master Production Schedule 1 4 Units 500 800 300 1,200 Hours Per Unit Rough-cut Capacity Final Assembl Quality Inspection Packaging 168 0.56 0.07 0.04 280 351 201 448 56 32 21 12 Total Capacity Hours Required 335 536 201 ??? Type your