Question: 7 . 6 For Problem 7 . 1 , calculate the minimum cycle length and the effective green time for each timing stage ( balancing

7.6 For Problem 7.1, calculate the minimum cycle
length and the effective green time for each timing
stage (balancing vc for the critical lane groups).7.6 For Problem 7.1, calculate the minimum cycle
length and the effective green time for each timing
stage (balancing vc for the critical lane groups).
Assume the lost time is 4 seconds per timing stage
and a critical intersection vc of 0.90 is desired.
7.1 An intersection has a three-timing-stage signal
with the movements allowed in each timing stage
and corresponding analysis and saturation flow
rates shown in Table 7.6. Calculate the sum of the
flow ratios for the critical lane groups.
Table 7.6 Data for Problem 7.1
Assume the lost time is 4 seconds per timing stage
and a critical intersection vc of 0.90 is desired.
The answer is not 290s
7 . 6 For Problem 7 . 1 , calculate the minimum

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!