Question: 7 . 7 For Problem 7 . 1 , calculate the optimal cycle length ( Webster ' s formulation ) and the corresponding effective green

7.7 For Problem 7.1, calculate the optimal cycle length (Webster's formulation) and the corresponding effective green times (based on lane group vc equalization). Assume lost time is 4 seconds per timing stage.
\table[[Timing stage,1,2,,3],[Allowed movements,NB L, SB L,NBTR,SBTR,EB L, WB L,EBTR,WBTR