Question: 7 At a demand paging system with TLB, suppose that the Memory access time =200 nanoseconds, Average page fault overhead + swap page out +

 7 At a demand paging system with TLB, suppose that the

7 At a demand paging system with TLB, suppose that the Memory access time =200 nanoseconds, Average page fault overhead + swap page out + swap page in + restart overhead =8 milliseconds TLB Lookup time is 20 nanoseconds, and TLB Hit ratio is 95%. If one access out of 1000 causes a page fault, how about the Effective Access Time? If one access out of 1000000 causes a page fault, how about the Effective Access Time? (10 points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!