Question: 7 machine are presented in the following table: Day Breakdown code Breakdown start time Breakdown end time Defective products 1 2 3 4 5 6

7 machine are presented in the following table:
7 machine are presented in the following table: Day Breakdown code Breakdown start time Breakdown end time Defective products 1 2 3 4 5 6 7 8 A - B B C D D - 3 - 16 - 10 17 - - 5 - 2 13 - 3 - 180 320 25 150 100 380 210 0 II. 9 10 11 12 13 14 15 - - E - F G - - 6 - - 153 - - 12 - 218 5 35 100 32 23 100 130 III The breakdown code represents each recorded breakdown. If the same code appears on more than one day, it is because the repair did not take place or was not finished on the preceding day. On the eighth day, a 24-hour scheduled stop was carried out for preventive maintenance tasks. The machine's total setup time is 187 minutes, and in those 15 days the machine produced a total of 6280 products. The company works 24/7. The theoretical cycle time is 2 minutes per part. Hint: The problem is very similar to previous OEE problems. The only difference is that there is a 24 hours' planned stop. As a result, the load time decreases. What are the quality, performance, availability rates and overall equipment efficiency (OEE) value? 1. Quality = A; 2. Performance A 3. Availability- A 4. OEE

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!