Question: 7 . What recommendations, both short and long term, would you make to Mr . Schaeffer to overcome the problems identified? Argue why your recommendations

7. What recommendations, both short and long term, would you make to Mr. Schaeffer to overcome the problems identified? Argue why your recommendations help. (15 points)
Answer:
- Short term
Advice 1: Optimize holding bins
To reduce truck and driver wait times, we'll optimize holding bins. Currently, we have:
1~16 Dry Berries Bins: 250 bbls *16=4,000 bbls
17~24 Dry and Wet Berries Bins: 250 bbls *8=2,000 bbls
25~27 Wet Berries Bins: 400 bbls *3=1,200 bbls
11 bins for wet berries (17~27),41%(11/27) of total capacity. With an expected 70%
of water-harvested berries, NNC needs to convert 8 more bins to wet bins at $10,000
per bin, and the total cost is $80,000.
The minimum of holding bins increase to 70%: 70%*27=18.9(equal to 19 bins)
We need to convert 8 bins (19-11=8) to hold wet berries.
The total cost of converting the bins is 8* $10,000 per bin= $ 80,000
Advice 2: Installing one additional dryer
By installing one additional dryer can improve efficiency. The cost of the new dryer is
$60,000. On peak days, NCC receives a total of 16,379.8 bbls (327,596/20), with
11,465.86 bbls are wet berries (70%*16,379.8).
Adding the dryer increases processing capacity from 600 to 800 bbls/ hr.
It will take 14.3 hours (11,465.86 bbls/800 bbls) to process, and the overtime is 6.3
(14.3-8) hours.
Original overtime calculation: 11,465.86 bbls/600 bbls=19.11 hours
Original overtime is total 11.11 hours (19.11-8)
After adding a new dryer: save 4.81 hours (11.11-6.3 new overtime)
Inventory rate: (11,465.86(bbls/ day)/12.15)- new drying capacity (bottleneck)=
943.69 bbls/ hr-800 bbls/ hr (bottleneck)=143.69 bbls/ hr
Bins of wet berries (17-27 bins) are total 3,200 bbls (250*8+400*3=3200 bbls)
3,200/143.69=22.27 hours, more than 12 hours so there will be no waiting line for
the trucks.
- Long term: Installing a color grading machine
Currently, NCC pays an extra $1.5 premium on 450,000 bbls.
The overpaid amount can be calculated as follows:
Overpaid amount =(450,000*1.5)/2(assuming half is not graded as 3 but is
included in 3)= $337,500(the cost incurred when the machine is not efficient)
The cost to install one machine is $40,000, and it includes the full-time operator's
salary. The cost of a full-time operator can be calculated as follows:
1(operator)*12 hours* $13(average pay rate for an full-year employee)*30 days/
month*12 months/ year = $56,160
Therefore, the total cost of this improvement in the first year is $40,000(installation
of the color grading machine)+ $56,160(cost of a full-time operator)= $96,160.
In the first year, NCC will save $337,500- $96,160= $241,340.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!