Question: 7.7. worker - machine operation was found to involve 3.3 minutes of machine teine per cycle. In the course of 40 cycles of a stopwatch

7.7. worker - machine operation was found to

7.7. worker - machine operation was found to involve 3.3 minutes of machine teine per cycle. In the course of 40 cycles of a stopwatch teme stopwatch time study, the workeris teme loading and unloading the machense averaged 1.9 minutes per cycle, and the worke, was given a reting of 120 percent. Assuming an allowance 12 percent of test time, determine the standard teine for this operation (including the machene teme), factor of