Question: 8 - 1 . A treatment plant being designed for Cynusoidal City requires an equalization basin to even out flow and BOD variations. The average

8-1. A treatment plant being designed for Cynusoidal City requires an equalization basin to even out flow and BOD variations. The average daily flow is 0.400m3s. The following flows and BOD5 have been found to be typical of the average variation over a day. What size equalization basin, in cubic meters, is required to provide for a uniform outflow equal to the average daily flow? Assume the flows are hourly averages.
\table[[Time,Flow, m3s,BOD ?5,mgL,Time,Flow, m3s,BOD ?5,mgL
8 - 1 . A treatment plant being designed for

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!