Question: 8 . 2 2 A 3 0 - m wide, 4 0 - m long, 8 - m deep construction excavation needs to be made
A m wide, long, deep construction excavation needs to be made in a silty
clay CL The groundwater table is at a depth of The sides of the excavation will be
sloped at an angle of about horizontal to vertical, and no sensitive structures or
other improvements are nearby. Suggest an appropriate method of construction dewa
tering for this site, and explain the reason for your choice. Include statements of any
assumptions, if any.