Question: 8 . 3 Estimating the Critical Gap at 9 6 t h and Zionsville Road. The top portion of the summary of gap events (

8.3 Estimating the Critical Gap at 96th and Zionsville Road. The top portion of the summary of gap events (using the format of table 8.1) is shown below. Eighty-eight right-turning vehicles accepted gaps. Only the 54 vehicles with the shortest gaps are included in the table shown below.
A. Fill in the empty cells in Columns 4 and 5. Show your calculations for the row in which t=5sec.
B. Estimate the critical gap to the nearest 0.01 sec . Show your calculations.
C. Repeat the analysis, this time using three approach lanes on SB Russel Street. Do the results change, as far as whether a signal is warranted?
\table[[\table[[Length of gap],[(t sec.)]],\table[[(2)],[Number of],[accepted gaps],[less than t sec.)]],\table[[Number of],[rejected gaps],[(greater than t sec.)]],\table[[(4)],[accepted gaps A(t)],[(less than t sec.)]],\table[[(5)],[Percent],[Rejected gaps R(t)],[(greater than t sec.)]]],[0,0,145,,],[1,1,125,,],[2,2,63,,],[3,6,34,,],[4,8,20,,],[5,14,7,,],[6,18,5,,],[7,28,2,,],[8,33,2,,],[9,42,2,,],[10,47,1,,],[11,54,0,,]]
8 . 3 Estimating the Critical Gap at 9 6 t h and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!