Question: 8 N . S 8 . A city is planning the installation of a new water treatment plant to supply a growing population. There will

8 N.S 8. A city is planning the installation of a new water treatment plant to supply a growing population. There will be only one rapid mix basin and then the flow will evenly split between two flocculator trains, each with three basins of equal in volume. The required water depth of all basins is 4.0 m. Q =35 X 103 m3/day; =1.139 X 10-3 N.s/m2 in m2 ky bzy z gm
(a) Determine correct basin volumes, dimensions, and required power input using the following
parameters.
Rapid mixing: Time =2 min; G =600 S-1
Flocculator: Time =30 min; G =70 S1,50 S,30 S-1
(4 mark)
(b) Calculate the Monthly alum requirement if the alum dosage is 30 mg/L.
(1 ma

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!