Question: 8 N . S 8 . A city is planning the installation of a new water treatment plant to supply a growing population. There will
NS A city is planning the installation of a new water treatment plant to supply a growing population. There will be only one rapid mix basin and then the flow will evenly split between two flocculator trains, each with three basins of equal in volume. The required water depth of all basins is m Q X mday; X Nsm in m ky bzy z gm
a Determine correct basin volumes, dimensions, and required power input using the following
parameters.
Rapid mixing: Time min; G S
Flocculator: Time min; G S S S
mark
b Calculate the Monthly alum requirement if the alum dosage is mgL
ma