Question: 9. (1 point) Consider the project duration obtained from the critical path of the previous question to be the most likely estimate, Let the most

9. (1 point) Consider the project duration

9. (1 point) Consider the project duration obtained from the critical path of the previous question to be the most likely estimate, Let the most optimistic estimate be 10 weeks and the most pessimistic estimate be 40 weeks. Use the PERT formula for estimating the duration of the project. 9. (1 point) Consider the project duration obtained from the critical path of the previous question to be the most likely estimate, Let the most optimistic estimate be 10 weeks and the most pessimistic estimate be 40 weeks. Use the PERT formula for estimating the duration of the project

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!