Question: 9 . 8 SUmmary 2 0 5 2 . Repeat Problem 1 for the following projects with soil conditions as indicated in Figure 9 .

9.8 SUmmary
205
2. Repeat Problem 1 for the following projects with soil conditions as indicated in Figure 9.22.
a.1200ft of an 18-in. sewer line is to be placed in a trench about 16ft below ground surface.
b. A 30-ft-diameter concrete pump station is to be founded on the basalt rock at 65ft in depth.
c. Conditions as in a, except that the pipeline is 28ft below the ground surface.
FIGURE 9.22 Soil profile.