Question: 9 Required Information Two full - sized a c - m m boords are nailed to 8 b c - m m board and the

9
Required Information
Two full-sized a c-mm boords are nailed to 8bc-mm board and the resulting beam that is subjected to o vertical shear of 1500N. Knowing thot the sllowable shesring force in esch nail is 135N, detemine the allowable spocing sthat can be used between each poir of nsils. Asume =45mm,b=45mm and c=90mm.
Moment of Inertia
The centroidsl moment of inertio of the cross-section, about the z-sxis, is given as zz=90(135)312(mm4)=18.45310-6(m4) First moment of area
z
For the cutout generated by cutting through only the nails, the first moment of the ares obout the z-axis is given as Qz=459045(mm3)=1,82310-4(m3)
Allowable spacing
The sllowable spscing of the nsils is ,(mm and is a
9 Required Information Two full - sized a c - m m

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!