Question: 9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? 10. Using the ABC system, how much total

 9. Using the ABC system, how much total manufacturing overhead cost
9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y?
10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z?
11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z?
12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z?

Required information [The following information applies to the questions displayed below. Hickory Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all $696,000 of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Cost Expected Activity Activity Cost Pool Machining Machine setups Product design General factory Activity Measure Machine-hours Number of setups Number of products 88,000 Direct labor-hours 254,000 13,200 DLBe 224,400 11,000 HHs 129,600 240 setups Activity Measure Product YProduct 2 Machine-hours Number of setups Number of products Direct labor-hours 7,400 60 3,600 180 8,400 4,800

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!