Question: 91. Solve the following MRP problem using this product tree structure and the information below. Level C(2) D(2) E(3) D 2 From the Master Production

91. Solve the following MRP problem using this

91. Solve the following MRP problem using this product tree structure and the information below. Level C(2) D(2) E(3) D 2 From the Master Production Schedule, the gross requirements for item A are: Period T2 T3 T4 5 6 7 8 Gross Reqt's 15 3 0 20 15 20 20 30 40 The following table includes the lead times, lot sizes, available balances at the Item Lead Time Lot Size Available Balance Scheduled Receipts 10 200 A 1 L4L 20 in period 1 10 minimum 20 15 in period 4 200 minimum None D 2 100 multiple 200 None EL 2 50 multiple 100 None Note: "10 minimum" means you can order 10, 11, 12 but not lower than 10 (e.g. 9); "100 multiple" means you can order 100, 200, 300, etc. Find the planned order releases for items B-E during the next 8 periods. Format like Item A, which is already filled out for you. (assume safety stock requirement is zero) 00 T: Part: A SS: 0 LS: L4L L Gross Requirements Scheduled Receipts Planned Order Receipts Available Balance Planned Order Releases Period 4 15 0 5 20 0 6 20 0 7 30 0 8 40 Item 1 1 2 3 15 30 20 20 0 0 0 20 1015101 15 15 20 30 0 O 40

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!