Question: A 1 0 - in thick, 2 6 - ft wide concrete pavement is to be placed with a slipform paver using 8 - cy
A in thick, ft wide concrete pavement is to be placed with a slipform paver using cy batches mixed at a centralmix plant. Each batch is mixed for an average of min, and the plant is efficient.
Plant production matches paver production. Paver production is efficient. Truck cycle time is min. Hourly rates:
Equipment Labor
Paver, $Foreman $
Texture Bar, $ Operators, $ each
Tine Bar, $ Laborers, $ each
Water Truck, $ Finishers, $ each
Pickups, $ each Truck drivers, $ each
Haul Truck, $ each
Concrete materials cost $cy batching cost is $cy and incidentals cost $cy Overhead and profit is of the previous costs. Round up and add an additional truck to balanced number.
Find a number of trucks, b paver speed, c $cy cost and d $sy cost
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock