A 1 st order sensor is to be installed into a reactor vessel to monitor temperature. If
Fantastic news! We've Found the answer you've been seeking!
Question:
A 1 st order sensor is to be installed into a reactor vessel to monitor temperature. If a sudden rise in temperature greater than 100°C should occur, shut down of the reactor will need to begin within 5 second after reaching 100°C. Determine the maximum allowable time constant for the sensor?
Related Book For
Engineering Economy
ISBN: 978-0132554909
15th edition
Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Posted Date: