Question: A 15 -station in-line transfer line has an ideal cycle time of 1.6min. Station breakdowns occur with a probability of 0.01. Average downtime is 5.0min

A 15 -station in-line transfer line has an ideal

A 15 -station in-line transfer line has an ideal cycle time of 1.6min. Station breakdowns occur with a probability of 0.01. Average downtime is 5.0min per line stop. The starting work part is a casting that costs $4.25. Operating cost of the transfer line is $108/hr, and tooling cost is $0.07 per piece per station. Determine (a) ideal production rate, (b) frequency of line stops, (c) average actual production rate, (d) line efficiency and (e) cost per completed part

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!