Question: A 2 . 7 acre wet pond was monitored for five months ( from May 1 through September 3 0 ) and the following data

A 2.7 acre wet pond was monitored for five months (from May 1 through September 30) and the following data collected:
Starting stormwater volume =220,000cf
Ending stormwater volume =180,000cf
Total inflow volume =91,000cf
Total outflow volume =77,000cf
Direct precipitation onto the pond =12.4 inches
Average pan evaporation rate =0.10 inches/day
Estimate the volume of water that infiltrated into the existing soil below the pond (5 points)