Question: A 5 0 - mgpd ( million gallons per day ) water treatment plant was proposed in 2 0 1 3 for Ureka. A 6
A mgpd million gallons per day water treatment plant was proposed in for Ureka. A mgpd plant using the same treatment process was built in in Vancouver for $ Given the following additional information and assumptions:
Poor site condition in Vancouver required an additional $ for foundations, which is not anticipated for Ureka.
Assume the power sizing size exponent
Assume inflation will persist at an average per annum.
Assume the location index for Vancouver is and for Ureka.
A new highpressure filter process will be added at Ureka at an additional cost of $
The construction period for the new plant will include winter construction. The Vancouver plant was not constructed through a winter season. Assume an increase in construction costs for Ureka of
In order to make an order of magnitude estimate of the water treatment plant in Ureka, various multiplication factors need to be calculated.
Question : The multiplication factor based on the different capacities is close to which value between or or or
Question : The multiplication factor based on the effect of inflation is close to which value between or or or
Question : The multiplication factor based on the different location indexes is close to which value between or or or
Question : The order of magnitude estimate of the water treatment plant in Ureka is close to which value between $M or $M or $M or $M
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock