Question: a ) ( 8 pts . ) Running this line as a push system, and with a single machine in each stage, what is the
a pts Running this line as a push system, and with a single machine in
each stage, what is the maximum number of units the line can produce in
an hour yes they work from AM to AM day? Hint: maximize the
throughput while assuring the CT is hours or shorter.
b pts Mr Aramazo has been approached by John OCush an
entrepreneur and a longtime customer. Mr OCush believes he can
increase the sales to units per day easily. The first thought that crosses
Mr Aramazos mind is that he needs to set up a number of parallel lines,
consisting of a single machine per stage but he quickly figures thats not
practical for many reasons. Instead, he decides to add parallel machines in
each stage but preserve the structure of a single line. Under the same
hour cycletime constraint, what are the minimum number of machines at
each stage to produce the desired units in hours? Hint: If there are
multiple solutions with the same minimum total number of machines,
choose the one that also minimizes the cycletime.
c pts Whats the cycle time of the line with multiple machines per stage
designed in part b
d pts Interpret the results obtained in parts b and c in comparison to
running multiple independent lines with a single machine in each stage in
parallel. What factors contribute to the efficiencies you observe?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock