Question: a ) A GRID system is being used to conduct a detailed survey. Assume that a ground of dimensions 4 0 2 5 m is

a) A GRID system is being used to conduct a detailed survey. Assume that a ground of dimensions 4025 m is being surveyed. Draw the grid lines to conduct this survey
b) The booking sheet of a GRID survey has readings as given below.
The spot heights at the grid intersection points have been calculated and are provided in the grid below.
Identify at least five points on the grid through which the contour line 100.600 will pass.
c) The following data is given.
i. Higher contour is 100.830
ii. Lower contour is 100.580
iii. Distance from higher contour to grid is 24 mm
iv. Distance between contours is 34 mm

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!