Question: a . A pre - timed four - phase signal has critical lane group flow rates for the first three phases of 2 6 0
a A pretimed fourphase signal has critical lane group flow rates for the first three phases of
and vehhsaturation flow rates are vehhIn for all phases The
lost time is known to be seconds for each phase. If an optimal cycle length of seconds
is being used, determine the effective green time for each of the phases.
b The minimum cycle length for an intersection is determined to be seconds. The critical
lane group flow ratios were calculated as and respectively.
Assuming seconds lost per phase, determine which was used.
c An intersection approach has a saturation flow of and vehicles arrive at a rate
of The approach is controlled by a pretimed traffic signal with a cycle length of
seconds. Local standards dictate the queues must dissipate at least seconds before
the end of the effective green time. Determine the maximum length of the effective red
that will satisfy these standards. a
A pre
timed four
phase signal has critical lane group flow rates for the first three phases of
and
veh
h
saturation flow rates are
veh
h
In
for all phases
The
lost time is known to be
seconds for each phase. If an optimal cycle length of
seconds
is being used, determine the effective green time for each of the phases.
b
The minimum cycle length for an intersection is determined to be
seconds The critical
lane group flow ratios were calculated as
and
respectively
Assuming
seconds lost per phase, determine which
was used.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
