a) b) 14 The average observed time for work element A is 10 sec. Westinghouse method is used to determine the tempo rate. It is only known that the evaluation for Skill is Excellent (81), and it is Good (C) for Environmental conditions. Hence. what can be the maximum value for work element A's normal time? 13.8 sec. 10 sec. 11.3 sec. 11.7 sec. 13 sec 1503196