Question: A bank has two sites at which checks are processed. Site 1 can process 10,000 checks per day, and site 2 can process 6,000 checks

A bank has two sites at which checks are processed. Site 1 can process 10,000 checks per day, and site 2 can process 6,000 checks per day. The bank processes three types of checks: Vendor, Salary, and Personal. The processing cost per check depends on the site. Each day 5,000 checks of each type must be processed.

Formulate a transportation problem to minimize the daily cost of processing checks (follow 5 steps introduced for modeling), and use Excel to find the optimal solutions (no need

to upload the Excel file, just write the optimal solutions).

A bank has two sites at which checks are

TABLE 11 Site (c) Checks 1 1 N Vendor 5 3 4 4 Salary Personal 2 5

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!