Question: A bank has two sites at which checks are processed. Site 1 can process 10,000 checks per day, and site 2 can process 6,000 checks
A bank has two sites at which checks are processed. Site 1 can process 10,000 checks per day, and site 2 can process 6,000 checks per day. The bank processes three types of checks: Vendor, Salary, and Personal. The processing cost per check depends on the site. Each day 5,000 checks of each type must be processed.
Formulate a transportation problem to minimize the daily cost of processing checks (follow 5 steps introduced for modeling), and use Excel to find the optimal solutions (no need
to upload the Excel file, just write the optimal solutions).

Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
