Question: A basement is 1 2 . 4 m wide and 1 5 . 8 m deep. You are designing the floor frame over a third
A basement is m wide and m deep. You are designing the floor frame over a third of this basement. You are
placing two builtup wood beams on the rear wall and the bearing wall to support joists, equally dividing the width of
the space. Assume that the clear spans as m and m and that this floor is topped with a mm thick concreteFind the smallest joist between beams if you were to use Grade Douglas FL joists
@ mm spacing and with bridging
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock