Question: A bridge deck has to be built across a river from point 1 to point 2 as shown in Figure 1. The soil at location

 A bridge deck has to be built across a river from

A bridge deck has to be built across a river from point 1 to point 2 as shown in Figure 1. The soil at location A is quite elastic where the soil subgrade modulus is given as (2000+N) kN/m while the soil at location B is stiff. Take N = last 2 digits of your matric number (example GS12345, N = 45; GS12300, N = 00). The deck should be made of steel with a moment of inertia of 360 x 10 mm. Idealise the 2-span bridge deck by assuming the appropriate support conditions. Using stiffness matrix method, analyse the 2-span bridge deck under well-distributed load of 50 kN/m. Determine the unknown displacements and forces. 10 m 3 m * Soil location A Soil location B Figure 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!

Q:

\f