Question: A bridge project is being evaluated at i =5%.What is the capitalized cost for the Concrete option. NOTE:The construction costs are to be amortized, or

A bridge project is being evaluated at i =5%.What is the capitalized cost for the Concrete option. NOTE:The construction costs are to be amortized, or annualized.

Concrete: Construction cost $50,000,000

Annual Operating Cost: $250,000

Life 70 years