Question: A caisson is being used to construct a bridge pier 5 m of water. It is sunk through very soft clay 3 m into a

A caisson is being used to construct a bridge pier 5m of water. It is sunk through very soft clay 3m into a stiff clay with properties given in Table B18-1.The caisson is 15m in diameter (external) and formed of 0.75m thick reinforced concrete units. The base of the caisson after it is installed is a 3m thick reinforced concrete raft integral with the walls of the caisson. The raft is designed to carry a permanent load of 5000T. Assume the top of the caisson is always at least 1m above water level. Estimate the settlement of the caisson.