Question: A certain part is routed through 4 machines, it is made in very large quantities on a production line in which an automated work
A certain part is routed through 4 machines, it is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines. Transfer time between stations is [T] seconds per cycle. The total time required to set up the entire line is 150 hours. The operation times at the individual machines are given in the table below. Machine 1 2 3 4 Setup time (hr.) 4 2 8 4 Operation time (min.) 5.0 3.5 6.0 7.5 Find the theoretical production rate (parts per hour) for the production line.
Step by Step Solution
There are 3 Steps involved in it
GIVEN 4 machines rotal set up CYCLE TIME Let x Cotal time 150 time be th... View full answer