Question: a.) choose the correct time-phased product structure for the brackets b.) in which week do you need to start the castings? which week do the
As the production planner for Xanging Hu Products, Inc, your have been given a bil of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 hande and 1 casting. Each housing has 2 bearings and 1 shatt. There is no inventory on hand W Click the icon to view the product structure. Your boss at Xiangling Hu Products, Ine, has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week. 12 . The lead times for the components are brackot (1 week), base (1 week) spring (1 woek), clamp (I week), housing (2 weeks), handle (2 weeks), casting (4 weeks), bearing (1 week), and shatt (1 week). a) Choose the correct time-phased product structure for the brackot. A. a. c. D. As the production planner for Xengling Hu Products, Inc, you have been given a bill of matarial for a bencket that is made up of a base, 2 springs, and 4 champs. The base is assembied from 1 damp and 2 housings. Each clamp hat 1 handle and 1 casting. Each housing has 2 bearings and 1 shath. There in no imentory on hand. L" Click the icon so view the product structure. Your boss at Xianging Ha Products. Inc., has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week 12 . The lead bimes for the components are bockest (1 week) base (1 wook), spring (1 woek), elamp (1 week), housing (3 weeks), handlo (2 weeks), casting (4 weeks), boaring (1 week), and shat (1 weok) a) Choose the correct time-phased product structure for the bracket. A. As the production planner for Xanging Hu Products, Inc, your have been given a bil of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 hande and 1 casting. Each housing has 2 bearings and 1 shatt. There is no inventory on hand W Click the icon to view the product structure. Your boss at Xiangling Hu Products, Ine, has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week. 12 . The lead times for the components are brackot (1 week), base (1 week) spring (1 woek), clamp (I week), housing (2 weeks), handle (2 weeks), casting (4 weeks), bearing (1 week), and shatt (1 week). a) Choose the correct time-phased product structure for the brackot. A. a. c. D. As the production planner for Xengling Hu Products, Inc, you have been given a bill of matarial for a bencket that is made up of a base, 2 springs, and 4 champs. The base is assembied from 1 damp and 2 housings. Each clamp hat 1 handle and 1 casting. Each housing has 2 bearings and 1 shath. There in no imentory on hand. L" Click the icon so view the product structure. Your boss at Xianging Ha Products. Inc., has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week 12 . The lead bimes for the components are bockest (1 week) base (1 wook), spring (1 woek), elamp (1 week), housing (3 weeks), handlo (2 weeks), casting (4 weeks), boaring (1 week), and shat (1 weok) a) Choose the correct time-phased product structure for the bracket. A
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts