Question: A coastal infrastructure project includes a pier which has a docking site at the end. The operation needs to be out of the breaking zone

A coastal infrastructure project includes a pier which has a docking site at the end. The operation needs to be out of the breaking zone and where sediments move. The pier deck will host high tech equipment which cannot be flooded by sea water. Some of the characteristics of the sea climate is shown in the following table:
Beach slope
0.07(V:H)
Annual average of significant wave height ?bar(H)s
2.6m
Annual standard deviation of significant wave height s
0.4m
Offshore (deep) storm wave height Weibull parameter
1.24
Offshore (deep) storm wave height Weibull parameter A
1.22m
Offshore (deep) storm wave height Weibull parameter B
1.17m
Number of storms with Offshore (deep) Hs>1.5 m during 20 years 1746
The waves for design are expected to have a period of 15s and coming with an angle of 45 degrees with respect to the vector perpendicular to the shoreline.
Ton view
Problem 1. Offshore design wave (1 Points). As a first step, determine the deep water wave whose wave height has a return period of 100 years. Use the Weibull distribution parameters and storm occurrence rate from the table to calculate the design wave.
A coastal infrastructure project includes a pier

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!