Question: A: Code B: Description C: Quantity D: Unit E: Rate F: Subtotal G: Factor H: Total 1 Employers Requirements 2 1.1 water presure cleaner -










A: Code B: Description C: Quantity D: Unit E: Rate F: Subtotal G: Factor H: Total 1 Employers Requirements 2 1.1 water presure cleaner - a water presure 1 item 2,683.68 2,684 2,684 cleaner is required as to clean the site from all debris and keep it clean and safe once a week 3 2 Management and Staff 2.1 Site Manager - a site manager is needed to 1 item 244,364.80 244,365 244,365 make sure the project is running smoothly until completion of the project 5 3 Facilities and Services 6 3.1 Skip Bin 15m3 - Skip bins are needed to put 1 item 7,181.80 7,182 7,182 all excess waste in to make sure the site is organised and safe with no hazards 7 4 Temporary Works 8 4.1 fencing- fencing is needed to close off the 1 item 1,317.60 1,318 1,318 project site from unauthorised people and secure the site 9 5 Site Accommodations 10 5.1 toilet-tempory toilets are necessary on site 1 item 3,000.00 3,000 3,000 until perminent toilets are built 17 6 Contract Conditions 12 6.1 insurance - insurence is required to cover the 1 item 21,600.00 21,600 21,600 duration of the project for safety of the contractors and the site 13 7 Mechanical Plant 14 7.1 crane- a crane is required to help with the 1 item 6,750.00 6,750 6,750 erection of the building 15 8 Non-Mechanical plant 16 8 external scaffolding - scaffolding is required 1 item 38,800.80 38,801 38,801 to make sure the project is built correctly and safely 17 Total sum 325,699Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity |D: Unit E: Rate F: Factor G: Total H: Include 1 1.1 water presure cleaner - a water presure day 111.82 24.0000 2,683.6 2,683.68 cleaner is required as to clean the site from all debris and keep it clean and safe once a week iTWO costX 9/10/2023 2:17:01 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 2.1 Site Manager - a site manager is needed 32 hrs 190.91 40.0000 244,364.80 244,364.80 make sure the project is running running smoothly until completion of the project 2 hourly rate of $190.91/hr iTWO costX 9/10/2023 2:18:04 PM EDUCATIONAL VERSION Page 1 of 1Page 1 of 1 Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 3.1 Skip Bin 15m3 - Skip bins are needed to put week 1,436.36 5.0000 7, 181.80 all excess waste in to make sure the site is 7,181.80 organised and safe with no hazards 2 combination rubbish 15m3 3 changed when full iTWO costX 9/10/2023 2:18:33 PM EDUCATIONAL VERSION Page 1 of 1Page 1 of 1 Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 1 4.1 fencing- fencing is needed to close off the 10.98 120.0000 1,317.60 project site from unauthorised people and 1,317.60 secure the site 2 parimiter of site 120m 3 hire over 30m cost per meter for any time period iTWO costX 9/10/2023 2:19:10 PM EDUCATIONAL VERSION Page 1 of 1Page 1 of 1 Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 5.1 toilet-tempory toilets are necessary on site week 200.00 15.0000 3,000.00 3,000.00 until perminent toilets are built 2 200 per week iTWO costX 9/10/2023 2:19:43 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity | D: Unit E: Rate F: Factor G: Total H: Include 6.1 insurance - insurence is required to cover the 1 policy 900.00 24.0000 21,600.00 21,600.00 duration of the project for safety of the contractors and the site iTWO costX 9/10/2023 2:20:18 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 7.1 crane- a crane is required to help with the 1 hrs 225.00 30.0000 6,750.00 6,750.00 erection of the building 2 mobile crane 20 tone capacity iTWO costX 9/10/2023 2:20:52 PM EDUCATIONAL VERSION Page 1 of 1Project: Default Project Details: Building: Maximus Bakhoum Assessment 2 A: Code B: Description C: Quantity D: Unit E: Rate F: Factor G: Total H: Include 8.1 external scaffolding - scaffolding is required 2 ma ,940.04 10.0000 38 ,800.80 38,800.80 make sure the project is built correctly and safely 2 2 story scaffolding 3 length 60m height 4.2m for 10 weeks or until the erection phase is complete iTWO costX 9/10/2023 2:22:30 PM EDUCATIONAL VERSION Page 1 of 1Section B: Demonstrate knowledge on Estimating Software If you were to use a popular estimating software to produce the priced Bill of Quantities for the given project, which software would you use? To answer above question, please produce above Preliminary Bill using an estimating software (e.g. costx) and comment on its key featureslvr functions and benefits in relation to the estimating function. Please justify your statements and findings in this section with relevant in-text referencing that should match with your end list references (about 500 words)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts