Question: A company has 3 4 projects that go through an assembly line. The longest mission takes 4 . 7 minutes, and the total time for

A company has 34 projects that go through an assembly line.
The longest mission takes 4.7 minutes, and the total time for all missions is 92 minutes.
The flow line will run for 615 minutes per day.
What is the maximum cycle time?
a)34 minutes
b)4.7 minutes
c)92 minutes
d)130 minutes